Introduction
Alluvial gold deposits are important sources of placer gold, but their processing can be challenging due to variations in ore composition, particle size distribution, clay content, and gold particle size. To achieve efficient gold recovery, a well-designed alluvial gold washing plant must combine effective ore washing, screening, gravity concentration, and concentrate upgrading.
Our 400TPH alluvial gold washing plant is an integrated gold washing and beneficiation system designed to process approximately 400 tons of raw alluvial ore per hour. The plant combines a feed hopper, vibrating feeder, trommel scrubber, centrifugal gold concentrator, sluice boxes, shaking tables, belt conveyors, slurry pumps, and other auxiliary equipment.
The processing system separates the raw ore into different particle size fractions and applies suitable gravity separation methods to recover gold from each fraction. This multi-stage processing approach helps improve gold recovery while reducing the amount of material requiring further treatment.
The plant is particularly suitable for alluvial gold deposits containing sticky clay. Its capacity, screening specifications, and gravity separation equipment configuration can also be customized according to the actual characteristics of the raw ore and the client's production requirements.
In this article, we will walk you through the complete processing flow and main equipment configuration of the 400TPH alluvial gold washing plant.
400TPH Alluvial Gold Washing Plant
The 400TPH alluvial gold washing plant adopts a combination of ore feeding, clay washing, screening, gravity gold concentration, and final concentrate upgrading.
The main processing sequence is as follows:
Raw Ore → Feed Hopper → Vibrating Feeder → Trommel Scrubber → Three-Stage Screening → Centrifugal Concentration / Sluice Box Recovery → Shaking Table Upgrading → Final Gold Concentrate
The main equipment includes:
- Feed hopper
- Vibrating feeder with 100 mm grizzly bars
- Trommel scrubber with customized screening meshes
- Centrifugal gold concentrator
- Sluice boxes
- Shaking tables
- Belt conveyors
- Slurry pumps
- Supporting water supply and tailings handling systems
Each piece of equipment performs a specific function, allowing the entire plant to operate as an integrated gold washing and beneficiation system.
1. Detailed Processing Flow
Step 1: Raw Ore Feeding Through the Feed Hopper
The raw alluvial gold ore is transported to the processing plant by dump truck or forklift and discharged into the feed hopper.
The feed hopper serves as a buffer storage unit, ensuring a relatively stable supply of raw material to the downstream equipment. The hopper capacity and dimensions can be designed according to the feeding equipment, site conditions, and required processing capacity.
Material is then automatically discharged from the hopper into the vibrating feeder.
Step 2: Preliminary Screening by the Vibrating Feeder
The vibrating feeder is equipped with 100 mm grizzly bars for preliminary separation of oversized materials.
During operation:
- Materials larger than 100 mm are separated and discharged to a designated stockpile area.
- Materials smaller than 100 mm pass through the grizzly bars and enter the trommel scrubber for further washing and screening.
This preliminary separation prevents excessively large rocks from entering the washing system, helping reduce unnecessary equipment wear and improve the efficiency of downstream processing.
The grizzly spacing can also be adjusted according to the characteristics of the raw alluvial ore.
Step 3: Clay Washing and Particle Classification by the Trommel Scrubber
The trommel scrubber is one of the most important pieces of equipment in this 400TPH alluvial gold washing plant.
Alluvial gold ore frequently contains clay, sticky soil, and compacted lumps. If these materials are not sufficiently disintegrated, fine gold particles may remain trapped inside the clay, reducing the efficiency of subsequent gravity separation.
The trommel scrubber uses mechanical agitation and water washing to break down clay lumps, clean the ore, and release gold particles from the surrounding materials.
After washing, the material is classified into three particle size fractions:
- 0–6 mm: Fine material, directed to centrifugal gold concentration.
- 6–20 mm: Medium-sized material, directed to sluice box recovery.
- 20–100 mm: Coarse material, transported to the stockpile area by belt conveyor.
The trommel scrubber's screening mesh sizes can be customized based on the particle size distribution of the raw ore and the occurrence characteristics of the gold.
Trommel scrubber or trommel screen: Which one should you choose?
The choice depends mainly on the clay content of the alluvial deposit.
- For alluvial gold ore containing sticky clay, a trommel scrubber is recommended because it provides both washing and screening functions.
- For alluvial gold ore with relatively low clay content, a trommel screen may be a more economical option because intensive clay scrubbing is unnecessary.
Selecting the appropriate washing equipment is essential for improving gold liberation and maintaining stable plant performance.
Step 4: Fine Gold Recovery Using a Centrifugal Gold Concentrator
The 0–6 mm material from the trommel scrubber is transported by a slurry pump to the gold centrifugal concentrator.
Fine alluvial gold can be difficult to recover using conventional sluice boxes alone, particularly when the gold particles are very small or have low settling velocities.
A gold centrifugal concentrator uses enhanced gravitational forces to separate gold particles from lighter gangue minerals.
During operation, the slurry enters the rotating concentration bowl. The centrifugal force helps concentrate high-density gold particles while lighter materials are discharged with the tailings.
The centrifugal concentrator is particularly useful for recovering fine gold that might otherwise escape through conventional gravity separation equipment.
To improve overall gold recovery, the tailings discharged from the gold centrifugal concentrator are directed to a sluice box for secondary gold recovery.
This combination of centrifugal concentration and sluice box recovery provides an additional opportunity to capture gold particles remaining in the fine material.
Step 5: Medium-Sized Gold Recovery Using Sluice Boxes
The 6–20 mm material separated by the trommel scrubber is sent directly to the sluice boxes for gold recovery.
A sluice box is a widely used gravity separation device in alluvial gold mining. It utilizes flowing water and differences in mineral density to separate gold from lighter sand, gravel, and other gangue materials.
As the material flows through the sluice box:
- Gold particles settle and become trapped in the sluice matting or riffles.
- Lighter sand and gravel are carried away by the water flow.
- Gold-bearing concentrate accumulates in the recovery section.
Sluice boxes offer a relatively simple structure, continuous operation, and low operating costs, making them suitable for large-scale alluvial gold processing.
The number and dimensions of sluice boxes should be determined according to the plant capacity, feed particle size distribution, gold particle size, and expected slurry flow rate.
Step 6: Coarse Material Transportation by Belt Conveyor
The 20–100 mm fraction from the trommel scrubber is discharged onto a belt conveyor and transported to the designated stockpile area.
This material is separated from the main gold recovery circuit according to the current process design.
However, its suitability for disposal or further processing should be evaluated through ore testing. If coarse gold particles or gold-bearing mineralized rocks are present in this fraction, additional crushing, washing, or recovery processes may be necessary.
This is an important consideration when designing an alluvial gold processing plant because gold distribution is not always uniform across different particle sizes.
Step 7: Final Gold Concentrate Upgrading by Shaking Tables
The gold-bearing concentrates collected from the centrifugal gold concentrators and sluice boxes are fed to shaking tables for final upgrading and purification.
A shaking table is a gravity separation machine that uses a combination of deck vibration, water flow, and differences in mineral density to separate valuable heavy minerals from lighter gangue materials.
During operation, gold-bearing concentrate is distributed across the inclined table surface. The reciprocating movement of the deck and flowing water separate materials according to their density and particle characteristics.
The resulting products generally include:
- Final gold-rich concentrate.
- Middlings, which may require further treatment or recirculation.
- Tailings containing relatively low concentrations of heavy minerals.
Shaking tables help improve concentrate grade by removing unwanted light minerals and reducing the amount of material requiring subsequent gold refining.
The number and specifications of shaking tables depend on the volume and characteristics of the concentrates generated by the upstream recovery equipment.
2. Main Equipment Configuration and Functions
The following table summarizes the main equipment used in the 400TPH alluvial gold washing plant.
| Equipment | Main Function |
| Feed hopper | Receives and temporarily stores raw alluvial ore |
| Vibrating feeder | Provides stable feeding and preliminary screening using 100 mm grizzly bars |
| Trommel scrubber | Breaks down sticky clay, washes ore, and classifies materials |
| Centrifugal gold concentrator | Recovers fine gold from the 0–6 mm fraction |
| Sluice box | Recovers gold from medium-sized material and centrifugal tailings |
| Shaking table | Upgrades gold-bearing concentrates and removes lighter impurities |
| Belt conveyor | Transports coarse material to the stockpile area |
| Slurry pump | Transfers fine ore slurry to the centrifugal concentrator |
The complete equipment configuration should be finalized after evaluating the raw ore properties, required processing capacity, and gold recovery targets.
3. Key Advantages
- Effective Washing of Sticky Clay
The trommel scrubber provides intensive washing and clay disintegration, helping release gold particles trapped in sticky clay and compacted soil. This makes the system particularly suitable for alluvial deposits with relatively high clay content. - Multiple Gold Recovery Stages
The plant combines centrifugal gold concentration, sluice box recovery, and shaking table upgrading. This multi-stage arrangement helps reduce potential gold losses and improve the quality of the final concentrate. - Flexible Screening and Equipment Configuration
The trommel scrubber screen mesh sizes can be customized according to the particle size distribution of the raw ore. The quantities of centrifugal concentrators, sluice boxes, and shaking tables can also be adjusted based on the distribution, size, and concentration of gold particles. - Customized Processing Capacity
Although this configuration is designed for 400TPH, alluvial gold washing plants can be engineered for different production capacities.
Final Thought: Building Your Optimal Recovery System
Every alluvial deposit tells a different mineral story. While our 400TPH plant presents a proven framework for high-volume recovery, we emphasize the importance of ore testing and process optimization.
Three critical considerations before implementation:
- Conduct comprehensive metallurgical testing to determine gold distribution across particle sizes.
- Analyze clay plasticity indices to customize scrubbing intensity.
- Pilot test centrifugal concentrator parameters for fine gold capture.
Our engineering team stands ready to help you adapt this system to your specific ore characteristics—whether adjusting trommel screen apertures, optimizing sluice box angles, or calibrating shaking table stroke patterns. Complete recovery begins with understanding your unique deposit.